Surveying MCQs Set-1

 20%

Page 1 of 5

1. Theory of errors and adjustments deals with minimizing the effect of

2. Due to curvature of earth, an object looks

3. __________errors are small unavoidable fluctuation.

4. Survey stations may be marked on the ground using a

5. A 20 m chain was found to be 10 cm too long after chaining a distance of 2000m. It was found to be 18 cm too long at the end of day's work after chaining a total distance of 4000 m. What is the true distance, if the chain was correct before the commencement of the day's work?

6. The magnetic declination is the difference between

7. How many types of chains are used in chain surveying?

8. The imaginary surface connecting points to which water would rise in tightly cased wells from a given point in an aquifer is called as

9. Which of the below is not a means of linear surveying methods?

10. The permissible limits of errors in chaining for measurement on rough or hilly ground is


 