Surveying MCQs Set-1

 20%

Page 1 of 5

1. A 20 m chain was found to be 10 cm too long after chaining a distance of 2000m. It was found to be 18 cm too long at the end of day's work after chaining a total distance of 4000 m. What is the true distance, if the chain was correct before the commencement of the day's work?

2. The permissible limits of errors in chaining for measurement on rough or hilly ground is

3. Radiation, Intersection and Resection are

4. The error due to bad ranging is

5. Hydrographic survey deal with the mapping of

6. Which of the following sight will be applicable for a change point?

7. The error in measured length due to sag of chain or tape is known as

8. In Surveying, offsets are

9. The process of a location of intermediate points on a survey line is

10. An error under the same conditions always of the same size and sign is called as


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

2 Responses

Leave a Reply