1. In how many ways can ranging be carried out?

2. The process of a location of intermediate points on a survey line is

3. Altimetry may be depicted most accurately by

4. In surveying, the angle on the horizontal plane between magnetic north and true north is called as

5. The permissible limits of errors in chaining for measurement on rough or hilly ground is

6. The book in which chain measurements are entered is called

7. A 20 m chain was found to be 10 cm too long after chaining a distance of 2000m. It was found to be 18 cm too long at the end of day's work after chaining a total distance of 4000 m. What is the true distance, if the chain was correct before the commencement of the day's work?

8. Which of the below is not a means of linear surveying methods?

9. A 30 m metric chain is found to be 10cm too short throughout a measurement. If the distance measured is recorded as 300 m, what is the actual distance?

10. In surveying, the triangles having angles smaller than 30 degree are called as


 