Environmental Engineering Part 2

 25%

Page 1 of 4

1. During putrefaction process the gas given off is

2. A sewer which receives its flow from a number of transverse sewers or outlets is called

3. Alignment of sewer lines is started from

4. Tests for BOD are usually made at

5. The dissolved oxygen level in natural unpolluted waters at normal temperature is found to be of the order of

6. The quantity of storm water from an area depends upon

7. The suitable method of forecasting population for a young and rapidly increasing city is

8. A man hole is generally provided at each

9. Fungi

10. The distribution mains are designed for


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

3 Responses

  1. Thank you for your sharing. I am worried that I lack creative ideas. It is your article that makes me full of hope. Thank you. But, I have a question, can you help me?

  2. Can you be more specific about the content of your article? After reading it, I still have some doubts. Hope you can help me. https://www.binance.com/join?ref=JW3W4Y3A

  3. Thanks for sharing. I read many of your blog posts, cool, your blog is very good.

Leave a Reply to Daftar untuk mendapatkan 100 USDTCancel reply