1. Alignment of sewer lines is started from

2. Standard EDTA ( ethylene diamine tetra acetic acid ) solution is used to determine the

3. The quantity of water available from an infiltration gallery depends upon the

4. The ratio in between length of the sewer and velocity of flow when running full is known as

5. The depletion of dissolved oxygen due to BOD reaction of sewage is called

6. The maximum efficiency of BOD removal is achieved in

7. The septic tank should be cleaned at regular interval but should not exceed

8. The hourly variation factor is usually taken as

9. Hydraulically the economical section of drains for large flow is

10. The proper gradient of sewer lines is ensured by


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

3 Responses

  1. Thank you for your sharing. I am worried that I lack creative ideas. It is your article that makes me full of hope. Thank you. But, I have a question, can you help me?

  2. Can you be more specific about the content of your article? After reading it, I still have some doubts. Hope you can help me. https://www.binance.com/join?ref=JW3W4Y3A

  3. Thanks for sharing. I read many of your blog posts, cool, your blog is very good.

Leave a Reply to binance referal codeCancel reply