Environmental Engineering Part 2

 25%

Page 1 of 4

1. The proper gradient of sewer lines is ensured by

2. On standard silica scale, the turbidity in drinking water should be limited to

3. A man hole is generally provided at each

4. The depletion of dissolved oxygen due to BOD reaction of sewage is called

5. The ratio in between length of the sewer and velocity of flow when running full is known as

6. Alignment of sewer lines is started from

7. The hourly variation factor is usually taken as

8. The suitable method of forecasting population for a young and rapidly increasing city is

9. The septic tank should be cleaned at regular interval but should not exceed

10. Tests for BOD are usually made at


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

Leave a Reply