Environmental Engineering Part 2

 25%

Page 1 of 4

1. Alignment of sewer lines is started from

2. The continuous flow of water may be expected from

3. The maximum efficiency of BOD removal is achieved in

4. On standard silica scale, the turbidity in drinking water should be limited to

5. Turbidity is measured on

6. During putrefaction process the gas given off is

7. During the treatment of sewage it is necessary to kill the

8. The dissolved oxygen level in natural unpolluted waters at normal temperature is found to be of the order of

9. Tests for BOD are usually made at

10. A street sewer into which sewer from house connections is poured is called


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

3 Responses

  1. Thank you for your sharing. I am worried that I lack creative ideas. It is your article that makes me full of hope. Thank you. But, I have a question, can you help me?

  2. Can you be more specific about the content of your article? After reading it, I still have some doubts. Hope you can help me. https://www.binance.com/join?ref=JW3W4Y3A

  3. Thanks for sharing. I read many of your blog posts, cool, your blog is very good.

Leave a Reply