Surveying MCQs Set-3

 25%

Page 1 of 4

1. Which one of the following is carried out by two theodolite method?

2. Which of the following is not a method used for plane table surveying?

3. The curves used for drawing lines between points in a contour line is

4. ____________________ are not mandatory in civil engineering projects like road works, dams, canals, etc.

5. The error due to bad ranging is

6. The difference between the most probable value of a quantity and its observed value is

7. A contour interval is the __________________ for all purposes.

8. In a transit theodolite, error due to eccentricity of verniers is eliminated by reading

9. An invar tape is made of an alloy of

10. Theory of probability is applied to


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

1 Response

  1. Can you be more specific about the content of your article? After reading it, I still have some doubts. Hope you can help me.

Leave a Reply to binance h"anvisningsbonusCancel reply