1. The ratio in between length of the sewer and velocity of flow when running full is known as

2. A man hole is generally provided at each

3. The dissolved oxygen level in natural unpolluted waters at normal temperature is found to be of the order of

4. During the treatment of sewage it is necessary to kill the

5. The quantity of water available from an infiltration gallery depends upon the

6. The location of flushing tank in a sewer in order to flush the sewer should be at its

7. The cells of bacteria are usually in the range of

8. A sewer which receives its flow from a number of transverse sewers or outlets is called

9. The quantity of storm water from an area depends upon

10. Tests for BOD are usually made at


 