Surveying MCQs Set-3

 25%

Page 1 of 4

1. Which of the following instruments is generally used for base line measurements?

2. The reference points on which a day's work is closed and from where levelling is continued the next day are called as

3. In case of angular measurements being more precise than the linear measurements, the traverse can be balanced by

4. To observe the included angle accurately, method preferred is

5. The main object of running a tie line is

6. ____________________ are not mandatory in civil engineering projects like road works, dams, canals, etc.

7. Theodolite is an instrument used for measuring

8. Indirect methods uses how many methods?

9. The line which separates the catchment basin from the rest of the area is

10. How many methods of contouring are present?


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

1 Response

  1. Can you be more specific about the content of your article? After reading it, I still have some doubts. Hope you can help me.

Leave a Reply