Surveying MCQs Set-3

 25%

Page 1 of 4

1. The process of marking intermediate points on a survey line is known as

2. Which of the following is not a method used for plane table surveying?

3. The error due to bad ranging is

4. If the probable error in single observation is ±0.04 m and that of the mean is ±0.01 m, then the number of observations are

5. The curves used for drawing lines between points in a contour line is

6. Which one of the following linear methods of setting out a circular curve needs reference of the centre of the curve?

7. For setting out right angles, the instrument used is

8. Which shaped lines indicate the presence of a ridge?

9. The reference points on which a day's work is closed and from where levelling is continued the next day are called as

10. Which of the following is not true for the direct and indirect methods of contouring?


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.