Surveying MCQs Set-3

 25%

Page 1 of 4

1. The process of marking intermediate points on a survey line is known as

2. If the probable error in single observation is ±0.04 m and that of the mean is ±0.01 m, then the number of observations are

3. Theodolite is an instrument used for measuring

4. Indirect methods uses how many methods?

5. The error due to bad ranging is

6. Which shaped lines indicate the presence of a ridge?

7. The longest chain line passing through the centre of the area is known as

8. The difference between the most probable value of a quantity and its observed value is

9. In case of angular measurements being more precise than the linear measurements, the traverse can be balanced by

10. Which one of the following is carried out by two theodolite method?


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

1 Response

  1. Can you be more specific about the content of your article? After reading it, I still have some doubts. Hope you can help me.

Leave a Reply