Surveying MCQs Set-3

 25%

Page 1 of 4

1. The curves used for drawing lines between points in a contour line is

2. The instrument, which is used to measure area upon contour map is

3. Which of the following is not a method used for plane table surveying?

4. The process of marking intermediate points on a survey line is known as

5. Which of the following is not true for the direct and indirect methods of contouring?

6. The longest chain line passing through the centre of the area is known as

7. The curvature of the Earth's surface is taken into account only if the extent of survey is more than

8. The position of a point can be fixed more accurately by

9. A triangle is said to be well conditioned if none of its angles is less than

10. Which one of the following is carried out by two theodolite method?


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

1 Response

  1. Can you be more specific about the content of your article? After reading it, I still have some doubts. Hope you can help me.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.