Surveying MCQs Set-3

 25%

Page 1 of 4

1. ____________________ are not mandatory in civil engineering projects like road works, dams, canals, etc.

2. The process of marking intermediate points on a survey line is known as

3. Theory of probability is applied to

4. The longest chain line passing through the centre of the area is known as

5. For setting out right angles, the instrument used is

6. The reference points on which a day's work is closed and from where levelling is continued the next day are called as

7. In a transit theodolite, error due to eccentricity of verniers is eliminated by reading

8. The error due to bad ranging is

9. The curvature of the Earth's surface is taken into account only if the extent of survey is more than

10. The instrument, which is used to measure area upon contour map is


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

1 Response

  1. Can you be more specific about the content of your article? After reading it, I still have some doubts. Hope you can help me.

Leave a Reply