1. Which of the following instruments is generally used for base line measurements?

2. The reference points on which a day's work is closed and from where levelling is continued the next day are called as

3. The position of a point can be fixed more accurately by

4. Number of links in a 30m metric chain is

5. The curvature of the Earth's surface is taken into account only if the extent of survey is more than

6. Theodolite is an instrument used for measuring

7. Which one of the following linear methods of setting out a circular curve needs reference of the centre of the curve?

8. How many methods of contouring are present?

9. The instrument, which is used to measure area upon contour map is

10. A contour interval is the __________________ for all purposes.


 