Engineering Drawing MCQs Practice Set-5

 20%

Page 1 of 5

1. There should be a visible gap between the wall and the _________ line.

2. The foundation contractor will work with the following architectural plans.

3. A full scale technical drawing will have a scale factor of ________.

4. This type of rapid prototyping system uses a laser to fuse powdered metals, plastics, or ceramics:

5. This is the measured size of a finished part:

6. The standard number of threads per inch for various diameters is the:

7. In an assembly section, these parts should have their section lines left out or shown solid black:

8. If designs require changes, they should be documented with:

9. In this type of section, one quarter of the object is removed:

10. This type of section is limited by a break line:


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.