Surveying MCQs Set-4

 25%

Page 1 of 4

1. Three point problem can be solved by

2. The rise and fall method

3. A series of closely spaced contour lines represents a

4. A building is an obstacle to

5. Which of the following is not used in measuring perpendicular offsets?

6. The horizontal angle between the true meridian and magnetic meridian at a place is called

7. For a line AB

8. The correction for sag is

9. With the rise of temperature, the sensitivity of a bubble tube

10. The sensitivity of a bubble tube can be increased by


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.