Engineering Drawing MCQs Practice Set-1

 25%

Page 1 of 4

1. This is a flat or rounded tab protruding from a surface, usually to provide a method for attachment:

2. Using this as a communication and design review tool can help shorten the process and eliminate productivity barriers:

3. Spur gear design normally begins with selecting this:

4. A line drawn with a long section, short dash, and another long section is a __________.

5. Before starting an isometric drawing in Auto-CAD the drafter needs to ________.

6. Drawings created with commercial software are typically saved as:

7. The default position of the UCS icon is positioned at ________ on the Auto-CAD grid.

8. When creating an isometric drawing in Auto-CAD the drafter can utilize the Dynamic Input and Polar Coordinate system to place both vertical and horizontal lines. A line created from one point 3 inches at 180 degrees would be a ________ line.

9. The first step in creating a traditional technical drawing is to ________.

10. The Offset tool should only be used for placing _________ in an isometric drawing.


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

1 Response

  1. Thank you for your sharing. I am worried that I lack creative ideas. It is your article that makes me full of hope. Thank you. But, I have a question, can you help me? https://accounts.binance.info/bg/register-person?ref=V2H9AFPY

Leave a Reply