Surveying MCQs Set-4

 25%

Page 1 of 4

1. A building is an obstacle to

2. Contour interval is

3. The length of a chain is measured from

4. Normal tension is that pull which

5. A series of closely spaced contour lines represents a

6. Benchmark is established by

7. Which of the following is not used in measuring perpendicular offsets?

8. The type of surveying which requires least office work is

9. With the rise of temperature, the sensitivity of a bubble tube

10. The horizontal angle between the true meridian and magnetic meridian at a place is called


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.