Filter:AllOpenResolvedClosedUnansweredSort byViewsAnswersVotesAs per IRC, when designing pedestrian and traffic signals using approximate method for a two-phase system, the minimum initial period with pedestrian signal should NOT be less than:OpenVideRime asked 3 years ago • Civil Engineering226 views0 answers0 votesSelect the correct option for the given statements. Statement 1: Bamboo can be utilised as a building material for scaffolding, bridges, houses and buildings. Statement 2: Bamboo, like wood, is a natural composite material with a low strength-toweight ratio and cannot be useful for structures.OpenVideRime asked 3 years ago • Civil Engineering250 views0 answers0 votesThe moment of inertia of a body is a measurement of:OpenVideRime asked 3 years ago • Civil Engineering244 views0 answers0 votesFollowing are the observations made on a closed traverseOpenVideRime asked 3 years ago • Civil Engineering441 views0 answers0 votesThe relative error in a closed traverse survey with perimeter of 500 m is 1 in 2000. If the closing error lies in the fourth quadrant (Positive – Y and Negative – X), then the errors in latitude and departure, closer to two decimal point, will be ________, respectively.OpenVideRime asked 3 years ago • Civil Engineering290 views0 answers0 votesThe A-line in the unified classification system table is used to determine the plasticity index (IP ) of soil sample on its liquid limit (WL ). The equation for the A-line is given as ______.OpenVideRime asked 3 years ago • Civil Engineering283 views0 answers0 votesWhich of the following types of pumps should be selected in order to pump the sewage from a septic tank to the water treatment system?OpenVideRime asked 3 years ago • Civil Engineering280 views0 answers0 votesWhich of the following is NOT employed in the secondary treatment of sewage?OpenVideRime asked 3 years ago • Civil Engineering230 views0 answers0 votesWhich method involves driving piles along both sides of an existing wall and inserting a needle in the form of pile caps through the existing one?OpenVideRime asked 3 years ago • Civil Engineering267 views0 answers0 votesSelect the correct option for the given statements. Statement 1: In level crossing, the canal water and drain water are allowed to intermingle with each other. Statement 2: A level crossing is generally provided when a large canal and huge drainage approaches each other practically at the same level.OpenVideRime asked 3 years ago • Civil Engineering292 views0 answers0 votesShare this Now with Friends: Share on WhatsApp (Opens in new window) WhatsApp Share on Telegram (Opens in new window) Telegram More