Filter:AllOpenResolvedClosedUnansweredSort byViewsAnswersVotesThe process of a location of intermediate points on a survey line isOpenVideRime asked 6 years ago • Civil Engineering1283 views0 answers1 votesGunter’s chain consists of ________________ links.OpenVideRime asked 6 years ago • Civil Engineering436 views0 answers0 votesHow many types of chains are used in chain surveying?OpenVideRime asked 6 years ago • Civil Engineering358 views0 answers0 votesWhich of the below is not an instrument used to set right angles?OpenVideRime asked 6 years ago • Civil Engineering1782 views0 answers-3 votesAn offset is a _______________distance of an object measured from the survey line.OpenVideRime asked 6 years ago • Civil Engineering530 views0 answers-1 votesA 30 m metric chain is found to be 10cm too short throughout a measurement. If the distance measured is recorded as 300 m, what is the actual distance? OpenVideRime asked 6 years ago • Civil Engineering384 views0 answers0 votesA 20 m chain was found to be 10 cm too long after chaining a distance of 2000m. It was found to be 18 cm too long at the end of day’s work after chaining a total distance of 4000 m. What is the true distance, if the chain was correct before the commencement of the day’s work?OpenVideRime asked 6 years ago • Civil Engineering1260 views0 answers0 votesTheory of errors and adjustments deals with minimizing the effect ofOpenVideRime asked 6 years ago • Civil Engineering799 views0 answers0 votesThe angle between true meridian and the magnetic meridian at the time of observations is known asOpenVideRime asked 6 years ago • Civil Engineering429 views0 answers0 votesAn error under the same conditions always of the same size and sign is called asOpenVideRime asked 6 years ago • Civil Engineering1507 views0 answers3 votesShare this Now with Friends: Share on WhatsApp (Opens in new window) WhatsApp Share on Telegram (Opens in new window) Telegram More