Environmental Engineering Part 2

 25%

Page 1 of 4

1. Partly or completely treated sewage flowing out of a sewage treatment tank or plant is called

2. Bacteria in sewage are mostly

3. A man hole is generally provided at each

4. The lowest point of the interior of a sewer or drain at any cross-section is called

5. The quantity of storm water from an area depends upon

6. Alignment of sewer lines is started from

7. 50 μm size particle is removed from gas by

8. The quantity of water available from an infiltration gallery depends upon the

9. Hydraulically the economical section of drains for large flow is

10. Fungi


 

VideRime

A Demrot is the founder of VideRime Online Learning, a leading engineering website. He did his BE Civil and M.Tech Structure from RGPV University, Bhopal and has been working as an Assistant Professor in a reputed college.

Leave a Reply