The rise and fall method

Questions › Category: Civil Engineering › The rise and fall method
VideRime Staff asked 6 years ago

The rise and fall method

a) is less accurate than height of instrument method

b) is not suitable for levelling with tilting levels

c) provides a check on the reduction of intermediate point levels

d) quicker and less tedious for large number of intermediate sights

Surveying MCQs Set-4