Questions › Tag: SurveyingFilter:AllOpenResolvedClosedUnansweredSort byViewsAnswersVotesThe process of a location of intermediate points on a survey line isOpenVideRime asked 4 years ago • Civil Engineering1164 views0 answers1 votesGunter’s chain consists of ________________ links.OpenVideRime asked 4 years ago • Civil Engineering309 views0 answers0 votesHow many types of chains are used in chain surveying?OpenVideRime asked 4 years ago • Civil Engineering232 views0 answers0 votesWhich of the below is not an instrument used to set right angles?OpenVideRime asked 4 years ago • Civil Engineering1647 views0 answers-3 votesAn offset is a _______________distance of an object measured from the survey line.OpenVideRime asked 4 years ago • Civil Engineering398 views0 answers-1 votesA 30 m metric chain is found to be 10cm too short throughout a measurement. If the distance measured is recorded as 300 m, what is the actual distance? OpenVideRime asked 4 years ago • Civil Engineering209 views0 answers0 votesA 20 m chain was found to be 10 cm too long after chaining a distance of 2000m. It was found to be 18 cm too long at the end of day’s work after chaining a total distance of 4000 m. What is the true distance, if the chain was correct before the commencement of the day’s work?OpenVideRime asked 4 years ago • Civil Engineering1006 views0 answers0 votesTheory of errors and adjustments deals with minimizing the effect ofOpenVideRime asked 4 years ago • Civil Engineering652 views0 answers0 votesThe angle between true meridian and the magnetic meridian at the time of observations is known asOpenVideRime asked 4 years ago • Civil Engineering310 views0 answers0 votesAn error under the same conditions always of the same size and sign is called asOpenVideRime asked 4 years ago • Civil Engineering1396 views0 answers3 votes