In a singly reinforced beam, if the permissible stress in concrete reaches earlier than the permissible stress in steel, the beam section is called
Questions › Category: Civil Engineering › In a singly reinforced beam, if the permissible stress in concrete reaches earlier than the permissible stress in steel, the beam section is called
In a singly reinforced beam, if the permissible stress in concrete reaches earlier than the permissible stress in steel, the beam section is called
a) Under reinforced section
b) Over reinforced section (Ans)
c) Balanced section
d) Economical section
Share this Now with Friends:
Related