A civil engineer working on a bridge design would probably rely on his ________ scale for checking printed drawings.

QuestionsCategory: Mechanical EngineeringA civil engineer working on a bridge design would probably rely on his ________ scale for checking printed drawings.
VideRime Staff asked 4 years ago

A civil engineer working on a bridge design would probably rely on his ________ scale for checking printed drawings.

a) Engineer’s

b) Metric

c) Architect’s

d) None of these

Engineering Drawing MCQs Practice Set-3