To derive the total flood hydrograph at a catchment outlet from an isolated storm, the order in which the following methods are applied, from the first method to the last method, is
Questions › Category: Civil Engineering › To derive the total flood hydrograph at a catchment outlet from an isolated storm, the order in which the following methods are applied, from the first method to the last method, is
To derive the total flood hydrograph at a catchment outlet from an isolated storm,
the order in which the following methods are applied, from the first method to the
last method, is
P. Obtaining the hyetograph
Q. Addition of baseflow
R. Estimation of initial and infiltration losses
S. Application of unit hydrograph
(A) PRSQ (Ans)
(B) PQRS
(C) RPSQ
(D) PSQR
Share this Now with Friends:
Related